17M+ sq ft worked on.
Zero recordable injuries. 50 states.
Crews we staffed, on jobs our clients held. Alpha supplies the erectors and their foremen; the contractor holds the erection scope. Client names and identifying details are withheld under our confidentiality agreements — the scope, scale, and outcomes are real.
- Hyperscale Data Center · Northern Virginia
Tier-1 Hyperscaler — Northern Virginia Campus
PEMB shell + insulated metal panel envelope for a 250K sq ft data hall. Maintained 100+ erectors through a compressed deployment with zero recordable injuries.
- Footprint
- 250K sq ft
- Crew
- 100+
- Schedule
- 9 months
- PEMB Erection
- IMP Installation
- Roofing Systems
- AI Compute Campus · Central Texas
AI Compute Campus — Central Texas
Multi-building IMP wall and roof panel installation for an ENR Top-10 GC. Crane-coordinated vacuum lifter ops kept panel throughput ahead of the curtain-wall schedule.
- Buildings
- 4
- Lifter Ops
- Dual-Crane
- GC
- ENR Top-10
- IMP Installation
- Wall Panels
- Roofing Systems
- Logistics / Last-Mile · Memphis, TN
Last-Mile Distribution Hub — Memphis
Nucor-manufactured PEMB shell with standing-seam roofing over a 180K sq ft last-mile fulfillment center. Crews staffed to a hard four-month lease-up schedule.
- Footprint
- 180K sq ft
- Manufacturer
- Nucor
- Schedule
- 4 months
- PEMB Erection
- Roofing Systems
- Wall Panels
- Cold Storage · Atlanta, GA
Cold Storage Facility — Atlanta
Butler PEMB shell paired with insulated metal panel walls and a full vapor barrier assembly for a 65K sq ft temperature-controlled distribution facility.
- Footprint
- 65K sq ft
- Manufacturer
- Butler
- Envelope
- IMP + VB
- PEMB Erection
- IMP Installation
- Insulation Systems
- Edge Data Center · Columbus, OH
Edge Data Center — Columbus
Rapid-mobilization deployment into a monopolistic workers-comp state under a GC-wrap OCIP program. Full compliance and onboarding completed inside the first week.
- Mobilization
- 40 Crew
- Program
- OCIP
- Jurisdiction
- Mono WC
- IMP Installation
- Wall Panels
- Structural Steel
- Industrial Manufacturing · Inland Empire, CA
Industrial Manufacturing Expansion — Inland Empire
Varco Pruden PEMB shell with structural steel secondary framing and architectural wall panels on a constrained, dense urban site requiring staged crane picks.
- Manufacturer
- Varco Pruden
- Site
- Dense Urban
- Erection
- Staged Picks
- PEMB Erection
- Structural Steel
- Wall Panels
- 17M+Sq Ft Worked On
- 2M+Craft Hours
- 0.71EMR (2026)
- 50States Deployed